Screed Rail Morayshire

The original and only certified solution

Get in touch

If you need any help, please feel free to contact us.

+44 (0)1656 746071

office@kform.co.uk

30 Sturmi Way
Village Farm Industrial Estate
Pyle
Bridgend
CF33 6BZ

The K-Form Brochure

Please request our Brochure for the latest product info and specifications

Kform.co.uk has been continuously making waves in the construction industry, and it’s not hard to see why. Not only do we offer a wide range of products and services designed to streamline processes and maximise efficiency, but we also continually innovate to create improved solutions that outperform the rest. One such innovative solution that’s been gaining attention in Morayshire and beyond is our flagship screed rail.Screed rail has long been recognised as a critical element in any construction project, an essential tool that ensures flawless floor installation. Here at kform.co.uk, we have taken the concept of the traditional screed rail and elevated it with cutting-edge advancements that significantly improve the construction process. Our screed rail ensures that the exacting requirements of contractors, builders, and engineers are met with the highest of standards. Our products are designed to enhance the accuracy and speed of laying screeds, thereby saving time and reducing costs.In Morayshire, which is known for its rich history and stunning landscapes, our screed rail has been particularly beneficial. Our products help developers and builders to tackle the specific challenges of this region, ensuring that the construction work is carried out carefully, with minimal disruption to the natural beauty of the area. The robust and durable materials used also mean that whatever is built can withstand the windswept, rugged conditions typical of Morayshire.Let us at kform.co.uk contribute to your construction journey. The screed rail solution that we offer is just one of the many ways we deliver excellence.

Specification

Designed for pours of 100mm – 140mm thick concrete (when used in conjunction with K25 Riser)

Enables adjoining bays to be poured consecutively

Pre-drilled holes in base for anchoring with mortar

Pre-drilled holes in vertical face for locating dowel bars

Once concrete is poured, K-FORM is left in place; no need to remove and clean

Separate wear strip can be removed once concrete is set to allow joint sealing