Distribution Facility, Kings Lynn

The Project

How it works
K-Form K135 Screed Rail was the right solution for this project and, being a sacrificial screed railing system with a built in isolation joint in the vertical section, it allowed the contractor to set up adjoining bays with falls to allow bigger areas to be poured at the same time.
Compared with using timber shutters the process time was dramatically increased and there were no hit and miss bay areas poured. In addition, there was no need to strike out timber to repeat the process afterwards.
The Solution
K-Form was used to form quick but accurate multiple falls and isolation joints. Simon Brown had successfully used K-Form before on traditional flat slabs and immediately saw the benefits on this more complicated project incorporating slot drainage.
“We were looking for a quick but accurate way to form multiple falls and isolation joints, having used K-Form before we knew it would work well for us”
Download Case Study
Get in Touch
Your email address will not be published. Required fields are marked