Screed Rail Anglesey

The original and only certified solution

Get in touch

If you need any help, please feel free to contact us.

+44 (0)1656 746071

office@kform.co.uk

30 Sturmi Way
Village Farm Industrial Estate
Pyle
Bridgend
CF33 6BZ

The K-Form Brochure

Please request our Brochure for the latest product info and specifications

On the beautiful island of Anglesey, K Form’s screed rail services bring efficiency, practicality, and precision to your construction process. Youthful and ambitious, we have established a reputation for excellence due to our commitment to delivering high-quality services. Our screed rails are second to none, offering a cost-effective solution to all your construction needs.The principle of our Screed Rails is simple, yet highly effective. Designed to save both time and money, our system eliminates the need for traditional timber shuttering. Suitable for all types of flatwork, they serve as an integral part of construction projects, large and small on Anglesey. As a company, we value innovation and our Screed Rail system is a testament to our forward-thinking approach. Its robust design is not only quick and easy to install but also provides a guide to ensure precise levelling.We’re proud to offer our screed rails to businesses on Anglesey, reinforcing our commitment to delivering unparalleled construction solutions across the UK. From small-scale renovations to large commercial developments, K Form’s screed rail system is the essence of practical, efficient construction. As we continue to grow, we look forward to supporting more Anglesey businesses in their building ventures with our cost-effective, time-saving screed rails.

Specification

Designed for pours of 100mm – 140mm thick concrete (when used in conjunction with K25 Riser)

Enables adjoining bays to be poured consecutively

Pre-drilled holes in base for anchoring with mortar

Pre-drilled holes in vertical face for locating dowel bars

Once concrete is poured, K-FORM is left in place; no need to remove and clean

Separate wear strip can be removed once concrete is set to allow joint sealing