K-Form Case Studies K-Forms Case Studies. Liverpool FC Training Facility Liverpool FC Training Facility, Kirby 08 July 2019 The complex which will span 9,200 square metres, will provide an elite performance centre for the first team... Read More Hornsea Leisure Centre Hornsea Leisure Centre, Hornsea 17 December 2019 K-Form specified has enabled us to speed up the process on site due to not having to strip formwork. Read More Ikea Mall, Dubai The Big Box New Ikea Mall, Jebel Ali, Dubai 04 Febuary 2020 Using K-Form enabled us to save huge amount of time and labour, bringing the project back on schedule Read More M42 Motorway M42 Motorway 3 May 2024 Our customer needed to replace metal barrier systems on M42 Motorway to install concrete areas for free standing Precast Motorway barriers. Read More
Liverpool FC Training Facility Liverpool FC Training Facility, Kirby 08 July 2019 The complex which will span 9,200 square metres, will provide an elite performance centre for the first team... Read More
Hornsea Leisure Centre Hornsea Leisure Centre, Hornsea 17 December 2019 K-Form specified has enabled us to speed up the process on site due to not having to strip formwork. Read More
Ikea Mall, Dubai The Big Box New Ikea Mall, Jebel Ali, Dubai 04 Febuary 2020 Using K-Form enabled us to save huge amount of time and labour, bringing the project back on schedule Read More
M42 Motorway M42 Motorway 3 May 2024 Our customer needed to replace metal barrier systems on M42 Motorway to install concrete areas for free standing Precast Motorway barriers. Read More